Week 58

Without going into too much drama about tempers flaring, lines of communication being tested, inspections on the edge and deadlines looming, …, despite all this, it’s all mostly going to plan. This week’s post will be mostly pictorial as I’m struggling to write anything at all coherent in the rush to finish this project. Loose ends include all electricals as we haven’t seen a blub a-flickerin’ yet, the entire fireplace concept, some of the big wood pieces from Neil, the sanitaryware, tiling and the drive. On the positive side, the Moldovian chippies Adrian and Vadim are generally fantastic and are busy getting on with doorframe, skirting and ironmongery. Terry and Josh finished the stairs too–I don’t think they’ll be in a hurry to fit any more capping in the hand and floor rails, but Josh remains undeterred, even when faced with a chisel in his hand and a trip to Epsom hospital. Didn’t stop him smiling when he returned to site to finish the day’s work.

The cornice company arrived early in the week and transformed some of the rooms.

house2017.05.23 - 9.jpg
awesome coving, but, oops, poor decision on light placement
house2017.05.23 - 10.jpg
does this work around the units?
house2017.05.23 - 1 (1).jpg
drawing room looking more formal

Finishing touches around the staircase are being decided with things like skirting beading, window/stair boards, and capping under the newels. James is great at making use of extra pieces to create some of the finishing touches. And it’s only when you see these things installed that you can get a feel for what the finished product looks like. Most things have been fantastic, and some require small tweaks, like the window board used on to top the plasterwork in the front bay. We’ve decided that the trim should have a profile more like the stairs, so this bit of boarding will be replaced, but it was excellent to have the flexibility and chance to check out the profile and have the option. This exercise prompted some deep thinking about what exactly we’re trying to do in the space.

house2017.05.23 - 1.jpg
is it a window board or a stair board?

Likewise with the trim between the structural oak and the floorboards. Initially, I wasn’t keen to have so many different kinds of oak hanging around, so I didn’t want the trim in at all when we started the finishes. And James’ advice was not to have too many different trims or the whole thing looks cluttered. But now I feel that if each piece does what it’s expected, then it follows the ethos of honest materials in the house, and it should be ok to have a little bit of trim that matches around the house, and it will blend in better in time. We opted for the little bead around the structural oak in the photo. The floors remain protected, and the windows will have a layer of dust on until the final sparkle-clean, so it’s hard to tell what the final finish will be anyway!

house2017.05.23 - 2.jpg
beading on the floor
house2017.05.23 - 5.jpg
under-newel

Vadim and Adrian have been boxing in pipework and building wardrobes around them. We’ve decided on a semi-complicated painting scheme with the interiors being darker shades of each room’s trim.

house2017.05.23 - 14.jpg
Gemma’s wardrobe
house2017.05.23 - 15.jpg
Gillian’s wardrobe
house2017.05.23 - 7.jpg
double checking the spec on ironmongery

Looking forward to snagging the kitchen next week. We’ll discuss a few trimming bits, and do a double check on things like the work-surface edge.

house2017.05.23 - 8.jpg
discussion piece: is this pencil or bevel?

The bathrooms are looking good, but we’re finding a few things that could have been better designed. Like,…. the door slamming into the unit when entering the bathroom. We’ll have to install a rubber baby buggy bumper on the back side of the door along with advice to tell the boys to be jolly careful without entering their bathroom with too much energy (shouldn’t be a problem, they’re a bit slow int he mornings). Much consultation with Allison in the States and friends in the UK to generate a survey of vanity unit heights in an attempt to get ours right. We’ve decided 900 to top of unit is a good height–a little higher than most, so it won’t be our family keeping the local chiropractors in business.

house2017.05.23 - 16.jpg
boys’ bathroom

In a dull moment, the guys found time to remove the plinth they’d lovingly installed before we changed our minds. Our MO seems to be build it, then remove it….

house2017.05.23 - 6.jpg
plinthless fire

…. just like the piers!

house2017.05.23 - 11.jpg
looks better now

house2017.05.23 - 12.jpg

Clinton never really liked the piers in the front; they were only put there to carry the rainwater downpipes into the ground in a clean swoop. So, taking advice from the architect and structural engineer who both said that they weren’t critical to the structure, we decided to take the bold (= expensive) move to remove them. This leaves an obvious problem for the bricklayers who now need to come back and make these areas pretty again. But the overhang looks much less fussy now, and we’re happy with it. At least we were until a giant gaping crack appeared around the first floor cavity trays.

house2017.05.23 - 18.jpg
omg

On further advice, we adopted a suck-it-and-see approach, and the whole thing looks pretty stable despite the crack. It hasn’t shifted since it first appeared, so should be ok. After all, there is an enormous great big steel holding up this side of the house, and the roof is all complete as one separate structure spread across the whole building. It SHOULD be ok. At least it is when I close my eyes. And a little mortar in the joint before we move in and all will be well. Right?

Lee, Jamie, Djokovich, and the groundwork gang were back to lay the paving for the patio. Their work was hampered by the water board inspector who deemed it fit to ask the guys to dig the main supply to the house a little deeper. This was an enormous pain which required un-building of the garage and some of the edging stones the guys had laid last week. The inspector didn’t stop there, took a deeper look at some of the work and started going off on other trench work depths, like the supply into the taps in the garden. He even had a go at some of the pipework internally, which never happens apparently. Usually the inspector has a cursory look around near where the water enters the building and leaves the M&E team to get on with things downstream. The groundwork guys have done hundreds of jobs like this without fuss, and the plumbing team was livid by the time the inspector finally passed it all, and all the trenchwork could be filled in. They’d none of them ever seen anything like it. Clearly this house has been jinxed from the start. The guy earned a few choice nicknames around site, and luckily for him some of the spare pieces of wood lying around didn’t get airborne.

house2017.05.23 - 1 (2).jpg

house2017.05.23 - 13.jpg
high water table in the mains trench
house2017.05.23 - 4.jpg
on the positive side, slabs are looking good

We’re even venturing into town to look at furniture and light fittings. Mostly these experiences highlight that fact that neither of us like shopping very much, nor do we like going into town unless it’s work related. We’re much more country-bumpkins these days. Either we’re super boring (likely), or we just dread the time it takes to travel around aimlessly looking at one low-profile uncomfortable sofa after another. I think Clinton was definitely going to lose the plot entirely if he got close to one more Edison bulb singeing his retinas.  The best way forward is to continue on our current course of clicking our way through doing most of the furnishings.

house2017.05.23 - 3.jpg
keeping the guys happy

Week 45

Early birds, these guys. On my way to meet the electrician at a lazy 7:30 am, I saw that they’d already had a delivery that was just departing down the lane.

house2017.02.18 - 1 (3).jpg

2017.02.18-1.jpg
oak cladding in morning light

More oak arrived late yesterday via Neil and his Land Rover with trailer; it’s always a pleasure to have him onsite. These pieces will cover the steels in the master bedroom, a design compromise that sits a little uncomfortably only because for the rest of the house, the wood is structural, and this isn’t. But with Neil’s skill in fabricating, and Josh, Terry and James’ skill in installing, I doubt we’ll be able to tell any difference between the cladding and the real deal at all in years to come. It looks very fresh at the moment when put up next to the stuff that’s been up for six months. Neil clearly spent ages on the comprehensive installation manual for the guys too. I’m sure they’re grateful!

house2017.02.18 - 1 (4).jpg
instruction manual
2017.02.18-2.jpg
Terry’s not putting it up on the wonk, it’s the lens distorting the angles
house2017.02.18 - 8.jpg
curved beam to match detail in the hallway

Meanwhile, work carries on around the rest of the house, and it’s crowded. Plasterers, roofers and electricians have been in all week, and I’ve been interviewing fireplace experts, interior designers and joiners.

house2017.02.18 - 10.jpg
fitting plasterboard from the vaulted section

The best bit of the week was our topping out ceremony. We, well, Tim really, decided it would happen when the last ridge tile went on. Originating in Scandinavia, this is an event that usually happens on bigger projects and usually involves chasing out evil spirits with branches of evergreen plants, and blessing the building for its future occupants in some way. Rather than inviting a random druid priest around or sticking the odd sprig of fir tree up the top of the scaffolding, we tried to keep it simple.

Our solution was that we signed the final ridge tile.  We got out our white pen and scribbled as a family, then got Tim, Ben, James, Terry, Josh, and Spencer to sign as well. So Spencer carefully left the last space empty for us to fit on the very front of the house. Excellent! It was a two-part event with fizz and sausage rolls on the Thursday as Clinton couldn’t be there for the actual fitting on the Friday. Everyone from the roofers to the tackers were there. Matt, Gillian’s boyfriend even joined in. Clinton said a few words of thanks, we armed Tim with the camera for some family snaps, and then we tucked right in!

house2017.02.18 - 9.jpg
Gemma setting up the buffet
house2017.02.18 - 11.jpg
builders buffet
house2017.02.18 - 12.jpg
it IS Oxshott after all
house2017.02.18 - 13.jpg
thanks, guys…
2017.02.18-3.jpg
… from all of us
2017.02.18-4.jpg
underside of the ridge tile
house2017.02.18 - 14.jpg
future residents
2017.02.18-5.jpg
Gemma and fake fizz

 

2017.02.18-6.jpg

2017.02.18-7.jpg
we even had waiting service

2017.02.18-8.jpg

2017.02.18-9.jpg
The A-Team: Ben, Jackson, Tim, Clive, Blake, Dave, Mike, Josh, Terry, James, and Spencer

So it seemed only fitting that after all these festivities and thank-yous that we actually got the signed tile on the roof.  The girls, Matt, and I spent a lovely sunny morning in Roofing School with Spencer (well, me watching them more than doing anything constructive).

house2017.02.18 - 1.jpg
up on the scaffold

 

house2017.02.18 - 2.jpg
Spencer prepares the area for the final tile
house2017.02.18 - 1 (1).jpg
Gemma lays the tile

Can’t say that our efforts contributed anything special, but it will be lovely to think that at least we had something tangible to do with the build as we look up at the front gable forevermore. The layers of cloaking look great, and the rest of the roof is just about there. Next week will involve Spencer doing a little tidying with other, lower, ridges, which leaves the scaffolding coming down Thursday or Friday!

 

house2017.02.18 - 3.jpg
final tile in place
house2017.02.18 - 4.jpg
cloaking closeup
house2017.02.18 - 5.jpg
“How are we going to get the leaves off THAT, Mum?”
house2017.02.18 - 6.jpg
can you spot the venting tiles?

house2017.02.18 - 1 (2).jpg

house2017.02.18 - 7.jpg
roofing signature

 

 

 

 

 

Week 27

The camera is in a great new spot, so I’ve put all the time-lapses at the beginning of the post. We were a little worried about sun-flare but I think the cloud cover worked in our favour this week.

There are a load of lazy grumpy wasps hanging around the wood. We noticed this when the oak frame arrived onsite, and it’s even worse now that the timbers are here. They like the wood to build their nests. We need one good frost and the problem will be solved but in the mean time, much batting and buzzing is occurring.

Friday

2016.10.14 - 1.jpg
Trevor and Josh moving trusses

Tim said he’s glad James has put the curtains on the oak frame. It’s not all that previous: James assures me it’s more to protect the oak from cutting bricks in the rain and preventing a layer of muck from building  up.

2016.10.14 - 5.jpg

2016.10.14 - 2.jpg

 

2016.10.14 - 3.jpg
not convinced about the trusses…
2016.10.14 - 6.jpg
… because there is not a lot of room for storage

We’re waiting on the central gable to to built before the wings go on. The central cable is vaulted through the hallway and the master bedroom and it’s supported by one great big steel. There is a short oak beam connecting the trusses in the structure, but it’s the steel that is holding up proceedings. But there is plenty to do with the internal blockwork, and the guys are confident that they’re almost done at this stage. They’ll be back once the roof is on so they can build up underneath it, but their team is shrinking as work nears completion, and even Quizmaster Paul is off on another job at the moment.

2016.10.14 - 4.jpg
building up the wall before the steel ridge beam arrives

2016.10.14 - 7.jpg

 

Thursday

Popped by to see some of the pointy bits up close.

2016.10.13 - 1.jpg
Dave hiding in a forest of trusses

2016.10.13 - 2.jpg

2016.10.13 - 3.jpg

Tuesday

Crane day. For steels in the roof and floor planks in the rear bay.

2016.10.11 - 1.jpg

2016.10.11 - 2.jpg

2016.10.11 - 3.jpg

Hooray! James and the gang did some magic  the concrete planks into the rear bay without touching any of the wood.

2016.10.11 - 4.jpg
looking up at a wonderful ceiling

2016.10.11 - 5.jpg

2016.10.11 - 6.jpg
a bit tight for the Land Rovers passing in the lane

2016.10.11 - 7.jpg

2016.10.11 - 8.jpg
gables for later in the week

There were lots of teams getting on with life on site today: the brick guys, the crane driver, James, the steels team and more general building guys to start fixing the gables on the steels.

When the crane is onsite, the brick guys have to abandon using the forklift, and they bring all the bricks, the blockwork, and the muck up by hand. Up the ladder. A million times a day.

2016.10.11 - 9.jpg

2016.10.11 - 10.jpg
door to back bedroom
2016.10.11 - 11.jpg
steels over the rear west corner bedroom
2016.10.11 - 12.jpg
same corner looking from the back to front of the house
2016.10.11 - 13.jpg
James made a nice little nest for the camera’s new home
2016.10.11 - 14.jpg
keeping Port Talbot going

2016.10.11 - 15.jpg

Mick reckons there will only be about three more courses of bricks to lay round the west side. The roof kicks out at the bricks around the angle of the spirit level he held up to show me. They’ll put the roof on, then Mick’s guys will lay the rest of the bricks under the roof before the soffits get put on.

2016.10.11 - 16.jpg
roof kick demo

Now that the concrete floor planks are out of the way, the guys can start building the walls for the closet and ensuite. Meanwhile, James had his Meccano set out to hold up the steel until the walls are there. Looks stable enough…. doesn’t it?

2016.10.11 - 17.jpg

2016.10.11 - 18.jpg

Saturday

I can’t resist taking pictures of the wood frame and the brick. I brought the wide angle lens down to have a play this weekend. We met up with Neil and Grant who were dodging raindrops, tidying up some of the oak frame and drilling holes in it (!) to secure it to the walls.

2016.10.09-1.jpg

2016.10.09-2.jpg

2016.10.09-3.jpg

2016.10.09-4.jpg

2016.10.09-6.jpg

2016.10.09-5.jpg

 

Week 26

Can you say “grey tiles”? Armed with my trusty samples of flooring and window frame, I’ve been playing Where’s Wally in a forest of grey.

The brick guys are matching up the facing bricks along the oak, and I’m so confident in their work that I must confess to having taken the perfect lines and balanced cuts for granted. But I’m also relieved that the bricks and the oak go so well together. It’s such a gamble making these big decisions and hoping for the best. It requires and open mind first of all, then lots of listening to experts paired with hours of research behind the scenes. But decisions made or not, the brickies continue to bring the building up and up and up. Mick had a big birthday over the weekend–Happy Birthday!

2016.10.07 - 5.jpg
Dave building up the front wall
2016.10.07 - 9.jpg
perfect facing brick, and blockwork that will live behind hanging tiles

I chose a beautifully sunny autumnal day to come to site, and James took me for a tour of the newly set-up roof-tier scaffold.

2016.10.07 - 6.jpg
through the rear bay to the front
2016.10.07 - 1 (1).jpg
looking south to Surrey

The back bay is being supported by some rogue struts before the roof ties it all together. You can see these in the photo. In fact, the oak guys are installing the ridge beam that connects the frames, so we’ll see them again in a few weeks. When the extra struts are removed, it will leave nail holes temporarily, but because they’re not drilled, no wood has left the system, so they’ll just close up in time. Clever in an olde-worlde kinda way. The whole process of building this house is as interesting as I hope the finished product will be beautiful.

2016.10.07 - 7.jpg
back bay
2016.10.07 - 8.jpg
our bedroom

The red steels are there waiting to be installed as the lintels over the internal doors. There are I beams and C beams, and for the life of me I forget which is used where. I think the I beam is for the lintel over the double doors to this room, and the C beams are …., well, um, yeah.

James took a bit of lead that had been knocking around his van for the past year and installed our first section on the west side of the front porch. A Finish–Hooray!

Martin from the window company came round on Tuesday to measure up before we went into production at the window factory. The bronze frames and the double glazed windows are manufactured separately and put together onsite. The Window Date is 9 Jan 2017.

2016.10.07 - 10.jpg
more leadwork to follow…. much more

There is a slight hiccup in the levels in the front porch area.  Dave is coordinating a solution with Tony, Tim, Ben, Neil and James. The whole landing is a little high on the first floor of the oak frame that hangs above the front door.

elastigirl-fThere is a debate about whether to keep the concrete floor planks and lower the level by reducing the screed, or by replacing the concrete with timber flooring which gives way more scope for changing relative heights. No one is excited about swinging the 1.5 ton planks anywhere near the wood, especially the crane driver. So clearly installation is another issue. Replacing the concrete planks with timber joists would fix the height and installation problems, but we had debated about this many moons ago in the planning stages and decided then that concrete was the way to go to give the building that really solid feel. Is it a compromise to change to timber or just an expedient solution? Or, is laying concrete planks on an oak frame a daft idea? We’ll have a good think over the weekend on which way to run with this: concrete or timber, but everyone is pulling together to work it out. The main things are to be flexible and listen to experts.

2016.10.07 - 1.jpg
artsy wood
2016.10.07 - 4.jpg
looking up through the back frame

We’ve had the pleasure of working with Claire who is designing the kitchen and utility spaces. I’ve interviewed many companies, but Claire has got the vision just right. What do you think?

Screen Shot 2016-10-08 at 06.19.12.png
ta da!
Screen Shot 2016-10-08 at 06.19.19.png
ta da from the other direction!

The scaffold team were busy on Wednesday and accidentally knocked the camera. It’s time to move it anyway…

 

Week 24

Friday

A visit to the joinery company that is doing the stairs, the oak subframes for the windows and the external doors.

Paul is our Area Manager and he’s always said to come on down and have a visit. As we’re getting to some crunch points with decisions, it sounded a great time to scoot to Andover to have a look. Today I got the chance to meet Gerald the MD, and he and Paul both took me for a tour of the factory before sitting down to talk design.

The factory is enormous. But it’s family run and has grown from a shed to a business with over 60 employees in a generation. There are 28 guys on the factory floor spread out into separate areas. There is a room for the initial cut as the laminated boards arrive from Germany, another for making tenons and mortice joints, another for windows, another for painting, another for stairs, and another for doors with CNCs, lathes, wrapped finished pieces and components all neatly placed in stacks per job. I’ve probably left out a few rooms,….but the guys were really busy as we went around, and everyone was really friendly and very patient with my picture-taking.

I was thrilled to see our job taking up (a large part of) the floor!

2016.09.23 - 1.jpg
window subframes

2016.09.23 - 6.jpg
… and more window subframes with joints
Laminates are used for the uncut beams so there won’t be any knots. They’re cut to section size on the outside dimensions, then they’re sliced on the remaining dimension to length, and finally, the mortice and tenon joints are cut in. Gerald fitted one of our subframes all up and assembled for me to have a look; the joints are seamless and the facing sides beautiful.

2016.09.23 - 3.jpg
our job. all three stacks with little white labels waiting to be cut
There are over 70 windows in the house, and each requires more than four bits of wood to make the subframe. Some of the larger pieces, like the sills, are made of two pieces with an air gap in between them to let them bend and settle on installation (I think?!)

We’re having clear Osmo coated frames and doors to retain the natural look of the wood, but it was still awesome to see the painting room. The windows are suspended on a series of hooks strung up to a yellow motorised track. They trundle past the guys to get a good coat of paint (150 microns a layer) and continue on to the other side of the wall to dry. Water is spritzed in to keep the paint from drying too quickly, so the room feels slightly tropical. This waterbased paint takes about 1.5 hours to dry, but our clear Osmo will go on with a brush and take 3 days to cure entirely.

2016.09.23 - 4.jpg
the painting room

2016.09.23 - 5.jpg
some stairs (not ours yet) and CNC
The stairs will be cut on a giant laser-guided CNC machine. I got to see a partially-build curved staircase made of gorgeous walnut; Paul had wanted to check the progress on it as he’d seen it the week before and it’s great to see these things evolve. Each piece for every job is drawn up, plugged into the computer and CNC’d to fit together perfectly. This particular job was gorgeous, and the whole operation is a real engineering marvel.

I’ve come away with some samples of different sized newell posts, a picture of cross sectional balustrades, two actual balusters to think about, and a lot of information about the front door from a discussion with Paul, Gerald, and Sean the Main Technical Manager. It’s going to be a busy weekend thinking through all this.

From Andover back to base, I had a chance to climb up the scaffold and have a look at the new bedrooms.

2016.09.23-2.jpg
West Wing

2016.09.23-6.jpg
east wing

2016.09.23-5.jpg
door to front bedroom

2016.09.23-3.jpg
back bay, pre-oak
What was the name of the first lady to fly across the Atlantic? What was the name of her airplane? What was the name of the Japanese city that was spared the atomic bomb and why? What were the names of those bombs? We’ve already nailed the name of the plane that dropped them along with the name of the guy who broke the sound barrier. We did moon landings a few weeks ago, and I’ve overheard a discussion about the bass line in Eagles songs when the guys first came onsite. I probably need some help brushing up on general knowledge if I spend too much more time onsite….

2016.09.23-4.jpg
Paul and Dave: pros
https://youtu.be/PfuIcSZRgdA

Thursday

Back to Sussex we go!

2016.09.22 - 1.jpg
Bluebell Railway from the car park
Another breathtakingly gorgeous drive in the time machine to visit our oak structural frame. It gets loaded on Friday and will be onsite on Monday. I will miss this drive! Neil gave me a tour of the pieces, and in particular wanted to show me the showstopper piece he sourced for us.

2016.09.22 - 2.jpg
ta-da!
2016.09.22a-1.jpg

The single-piece curved beam is a success. 2016.09.22 - 3.jpgThe alternative would have been to cut it out of
a very large section like he showed me in the sawdust on the floor. This would have been super expensive and not quite as nice because the grain would have made a horizontal trace to follow the growth of the original plank. The more cost effective alternative would have been to have cut two or three pieces and join them, and this is what we had specified originally. The many-pieced bends are what you see around town with other builds of this design. Ours will be the only single piece beam. Whoop whoop!

2016.09.22a-4.jpg
backs of brick infill bits

2016.09.22 - 4.jpg
more of our job
There are over 60 pieces for the rear bay alone. They’ll be stuck on the back of a lorry over the weekend, then up to us on Monday early a.m. They’re all labelled (red pen for front and green pen for back), and it’s great to visualise where the bits will fit in according to Dave’s drawings.

2016.09.22a-6.jpg
upside-down cross piece for gable with window rebates on the top

2016.09.22a-5.jpg
er, … a truss strut
It’s amazing how casual they are about taking these enormous beams and cutting chunks into them. They tell me that all the hard work, i.e. measuring and planning, has already been done, so this is the easy part. Very impressive!

On the way back, I put the anchors on as I passed the Bluebell Vineyard shop. A quick u-turn later and I was in the car park alongside a very Californian looking setup with tasting room and a nice few rows of well-tended vines. All was well, and then a great big tour bus from Eastbourne carrying a large number of pensioners arrived. I thought I might have just enough time to buy a bottle of their finest before they wandered in, but they were quick, and I was too late. My bottle of bubbles will have to wait until next time. And I think there just might be a next time because we’ve got designs on a nice countertop shelf for the basin in the downstairs WC. Back to Neil’s this autumn I think!

2016.09.22a-9.jpg
from idyllic Sussex….

2016.09.22 - 6.jpg
… to rainy base for our Thursday site meeting
Paul the electrical guy was due to arrive, but he was stuck on the M25 unable to move. Apparently a crane (nothing to do with us!) blew up into a massive fireball on the M40, and travelling anywhere near London was a bit of a no-hoper today. We look forward to meeting Paul another day.

We also welcome Claire aboard the good ship St Anne’s. She’s designed an awesome kitchen, and she was onsite this afternoon to measure up and ensure that the drawings matched reality. Apparently this isn’t always the case, but on this job the plans and the build match decisively. She’ll now make up a set of drawings for review, right down to the lights, sockets and tiling. We’re looking forward to that!

Monday

2016.09.20 - 1.jpg

Continuity–hooray! James is back onsite overseeing everything in his first pair of consecutive weeks in the job. Things are ticking along smoothly; but the brick team is running out of vertical interior walls to keep busy before the oak frame is installed next week.

We had a massive site meeting of the minds today: Dave the Architect, Tim the Contractor, Tom the Steels guy, Neil the oak guy, Paul the joinery guy, and of course James the Site Manager, Ben the Project Manager, and me tagging along trying to learn as much poss. Today’s lesson was: What’s a padstone? For those like me who have not a clue, these are extra strong blocks (not bricks) that the steel lintels sit on. Double doors require a steel above them to support the brickwork above, for instance. The brick team need to know the dimensions of the steels so they can set these padstones in the right places. Should be fine, right? They’re on the drawings. But if the steels are still somewhere between the drawings and physical arrival, the brick team usually waits until they’re onsite to line them up or they risk unbuilding what they’d already built off plan. And as luck would have it, this part of the project coincided with the engineer’s summer holiday plans, so we’ve been delayed in getting them even on paper. We’ve been playing the game of keeping the brick team onsite doing the interior blockwork when they’d really rather be getting on with setting the padstones and building the exterior walls. Next week, hopefully.

2016.09.20 - 3.jpg
crowded house
There was much discussion of how the oak frame will tie into the brick work. The frame is a really special thing–it’s meant to be completely self-supporting. As in, if you put it all together in the garden, it would stand up by itself. I totally respect the integrity of the structure and think it’s really important to have it do what it looks like its doing, and not pretend. A nice part of the build. We’re all looking forward to seeing it go up, so next Monday will be an exciting day.

There is a large A-shaped steel on the rear of the building between the oak frame and the brickwork that has yet to be finalised and manufactured, and this will be mainly to support the roof ridgeline. The roof is a very complicated thing, and although much of today’s meeting was spent discussing erecting the oak frame, Dave was on hand to make sure we don’t mess up the roof dimensions so that the pitch of steels matches the pitch of the oak once it’s up. Exactly. Tim wants to minimise the number of crane-days (too right, they’re bank), so it’s quite a job to line up the trades requiring cranes all on the same day/s. There are steels, oak frame and floor panels to juggle.

2016.09.20 - 2.jpg
front gable
One decision that had to be made today concerned the bowed beam on the front porch. We’ve spent a lot of time trying to get the look of it right: how thick, where to place it front to back in the frame, what circumference the bend should be…. But just to make things interesting, Neil arrived today with an idea. He said that he’s very lucky in that he has the luxury of spending time (he’s been part of the job since February, so that’s a while!) sourcing pieces for his jobs from all over Europe, and that he had found the Perfect Beam for this job. The one he’s picked is bent at just the right angle across the whole of the piece so that the grain follows the bend beautifully, and the beam can therefore be made of one piece. Previous designs had two or three chops in it to achieve the right bend. Dave says the chopped approach would make the build look like a pub. St Anne’s Arms? Clearly the single piece is the better option. It will be slightly skinnier as a result of The Perfect Bend, and it will now match the width of the vertical beams between the windows rather than the chunky vertical corner pieces. I’m sure this will all make sense when it’s up, and I imagine it will look quite elegant.

Ben says it will be amusing to watch me give tours of the finished product. He reckons I’ll be waxing lyrical about the cunning oak-brick tie-ins and the effective placement of the cranked steels when really all they’ll really be interested in is the nice paintwork and some colourful vases. We’ll see if I will be able to contain myself….

In the meantime, Mick, Paul, Dave, Glen and Johnny just keep happily laying more and more bricks…..

 

 

 

Week 21

We’ve come a long way in this build….

cropped-dji00159-1.jpgcropped-st-annes-pre-construction.jpg

The guys had a lot going on after the bank holiday: steels, cranes, personnel changes, rain. They’ve been steadily going upwards and we’ve been cracking on with decisions. We’re mostly there on bathrooms, kitchen, fireplace and roof tiles. We’re getting there on flooring and wall tiles.

The steels arrived on Wednesday. There are over 50 pieces in this build. There is a slight hiccup with the sizing of some pieces in manufacture, and after much checking some of them will need to be re-installed next Wednesday before the upper floor goes in.

The overhang on the west side of the front elevation is coming along nicely, and the steel is placed on the piers to take the load for the upper brickwork.

2016.09.04 - 4.jpg
overhang from the living room
2016.09.04 - 5.jpg
front elevation of the living room

The overhang on the west side of the house near the garage is larger and leaves a gap from windows to piers big enough to walk under. I’d better get on an plan the landscaping out the front in case we want some raised beds before it all gets paved over.

2016.09.04 - 6.jpg
west front elevation
2016.09.04 - 7.jpg
bird’s eye view looking into kitchen
2016.09.04 - 9.jpg
the garage in all its glory
2016.09.04 - 10.jpg
more steels across the entire build
2016.09.04 - 11.jpg
kitchen space

Roof tiles are very difficult to choose. We’ve spent some time looking through brochures and spent about a week developing a good mix of shades to make the whole project seem weathered–like it had been there for decades. When we presented our carefully considered combination to the builders, he said we were nuts. Why spend all that extra on something a) you won’t see, and b) will fade within a year? So we have decided on a single dark tile for the roof and another single reddish tile for the hanging bit on the west flank. Tick.

2016.09.04 - 12.jpg
we’re going for the left hand bunch

 

Week 20

Friday

We say goodbye to Nic and Justin and thank them very much for everything they’ve done for us. They’re great guys, keeping the build rolling along all together despite significant challenges that would flummox any mere mortal, and they still manage to make us laugh. Best of luck in the future, guys.

2016.08.28 - 8.jpg

Welcome aboard Tim and James!

We created a test panel of roof tiles to see if a mix might be better. Generally, the panel of vertical hanging tiles is lighter than the ones on the roof on most houses, and we’ll choose these if the price is right. At the moment, we’ve got to come up with a decent percentage blend so Tim can go and have it priced.

2016.08.28 - 6.jpg

Up until now, we’ve been trying to fit an AV system in the living room which is perfectly  normal you might think, but the challenge is to wedge it in above a fireplace. We’ve stalled out over the past few weeks in trying to get advice about combustable materials and convection venting grills, and as a result we’ve kept the team from building the far wall with the chimney. We’ve now made enough decisions to let the guys crack on with the wall. But the final design is still up for grabs!

2016.08.28 - 7.jpg

It’s awesome to see scaffolding up and steels in. The first floor planks are due to arrive in the second week of September with any luck.

Thursday and before…

Apologies for losing a few weeks in here.

2016.08.28 - 1 (2).jpg
distraction
2016.08.28 - 1.jpg
steels!

The view out the family room will take some TLC…. It’s not exactly jaw-dropping at the moment and probably not good enough to prompt the kids to avert their eyes away from the TV. The garage makes a super tea-hut/meeting room, but it makes an awful window.

2016.08.28 - 2.jpg
view out the family room

The oak frame is busy getting built in deepest Sussex and will go up at the end of September. In the meantime, the guys have finished all they can do on the porch.

2016.08.28 - 3.jpg
the front porch is looking nice

I’ve learned a LOT about chimneys, flues, regulations and what’s on the market. We’re aiming for a cassette woodburning fire. This requires a 150 cm flue and a Class I chimney. A traditional open fire would require a 9″ flue and a much larger chimney. Given how close we are to the fence, it’s obvious that we’ve had to limit our choices in this area.

2016.08.28 - 1 (1).jpg
chimney is covered in insulation with the red tags.
2016.08.28 - 4.jpg
chimney flue
2016.08.28 - 5.jpg
rebuilt rear bay–notice any difference?

Paul brought a sample of the oak subframes for the bronze windows to the last meeting. It’s enormous.

2016.08.28 - 9.jpg
sample oak subframe