Week 5

Friday

Today has been about waiting for the building control inspection and the concrete, and fingers were crossed for most of the day that they would arrive in that order.

The sides of the trenches were temporarily shuttered with big sheets of ply. The first steel reinforcements went in just fine: Jamie dropped them in using the digger and Lee coordinated. The grids have little plastic feet on them so they sit nicely in the trench.

IMG_1378 (1).jpg
the first steel footing

The footings will be about 800 mm of concrete then a couple or so courses of blocks, then bricks. The guys talk about concrete arriving in cubic metre loads.

I met Poppy the security system too.

FullSizeRender.jpg

Thursday

We had a peep down the well today, and the guys are amazed at how clear the water is. Back in the day, we used to fill the paddling pool up with the well-water using Chas’ irrigation pump. All the neighbourhood kids would come round and it’s a drag that we are no longer off metering. Apparently all new houses require a water meter.  But the swimming pool was awesome, if cold!

IMG_1340 (1).jpg
down the well

The well water wasn’t the only thing filled with water though….

IMG_1341 (1).jpg
where’s that pump?

The water table is pretty high where we are! Luckily, Nic has a pump just like ours and he’s drying it out before the building control guys come round to have a look. It needs inspecting before concrete is poured.

IMG_1348 (1).jpg
steel footings being discussed by Jamie and Lee
IMG_1350 (1).jpg
the “kitchen” in our bike store

Ben brought his drone down and he got a lovely shot.

IMG_1351.jpg
Ben and his DJI
DJI00155 - Copy.JPG
that’s a whole lot of nuthin
DJI00156.JPG
nerd and Nic

Tuesday

IMG_1339.jpg
Macrame with steels

The steel reinforcements arrived onsite. They’re single lengths and need to be formed into the shape of the foundation channels. The guys have had a little bonfire today while waiting for the steel, and they intend to start digging tomorrow.

Week 4

Friday

On site, the guys have been waiting for the steel reinforcements before digging. So they’ve tidied and sorted things like the water and electricity supply, the shrubbery, and making cozy the tea-hut/garage in the meantime.

IMG_1323.jpg
The well is pretty close to the foundations
IMG_1321.jpg
Tonka Toy Car Park

I’m leaving out all the paperworky-type drama like negotiating with the contractor to get into a contract, dealing with the warranty company (Dave is just about still smiling), making regular minor structural engineering amendments, hiring additional engineers surrounding the oak and the roof, and choosing a kitchen supplier. I haven’t even chosen the fun stuff yet! And I have no idea what the letting schedule is going to be like and where we’re going to put all the “stuff” onsite. It really is a full time job, and we’re grateful to Ben to coordinating it all. The whole team is working together to make this house happen, and Tim assures us the Christmas lights will be on this year. But while it seems all sweetness and unicorns now, our first valuation is due to happen next week…..

Wednesday

Met Lee today, he’s the main ground work guy. Lovely chap and very patient! He said there is quite often a lag when trades handover.

IMG_1320.jpg
baby digger and what Gareth calls a skip on wheels

We’re waiting around for the steel reinforcements for the foundations. It makes little sense to dig out the foundations only to have it rain and them to cave in over the bank holiday weekend. This wait is putting the plan back a week. The demo guys took a little longer than expected and the guys in the office won’t be happy to hear that nothing is happening this week except for some burning of the shrubbery.

Tuesday

We can see where the house is going to live! Very exciting.

Today was all about theodolites, stake and paint. The guys marked out Dave’s grid on the fences and from stakes set into the ground. The walls are outlined in blue paint. It’s fantastic to wander around with the ground floor GA drawings and look at the markers to figure out where you are. Just like Battleship.

IMG_1300.JPG.jpg
the back of the “house”

Screen Shot 2016-04-26 at 22.27.40.png

IMG_1301.jpg
stakes
IMG_1304.jpg
standing at the front door looking through the two gable ends
IMG_1306.jpg
garage
IMG_1307.jpg
looks plenty big enough from here
IMG_1310.jpg
knock knock
IMG_1311.jpg
the fences are full of these markers
IMG_1318.jpg
the well is just outside the walls, and the cordyline is under the stairs

It looks a LONG way back from the road. We realised that the ditch gives a false sense of space, since we’ll have to restore it and leave just the two bridges.

Dave came to site yesterday and said that the tolerances of the layout are within 20mm.  20mm?!! That’s bonkers. GPS will locate within a metre or so, but apparently it only took an hour to set out the whole thing. Pretty dang impressive.

Monday

Didn’t take any photos today, but it’s the first day of our new site manager, Nic, so welcome aboard.  They were due to set out the plot today which is exciting, but not much discernible change.