Week 82

My last post turned into a bit of a rant, so with this one I’ll do a complete 180 and focus on the really good changes in the build.

One of my pieces of advice for anyone starting a project like this is to plan the kitchen and the fireplace first. There are soooo many decisions that need to be made from soooo many trades that it’s best to coordinate a single plan before anyone arrives onsite with their spanners. The kitchen is a no-brainer for planning; with half a bijillion kitchen shops on the high street it’s one of Those Fun Things to do with a huge project like this.

Screen Shot 2017-11-06 at 16.34.17
chimney plan

But the fireplace has just as many trades involved if not more. We made the decision early on to have the face sit flush with the wall and the chimney sit proud of the house.

And we decided that the fuel would be gas. Neither of these stuck, and we now have a false chimney breast with a wood burning stove. Marvellous. The design process has taken literally months, and I have managed to piss off my whole team, including my darling husband, so much with indecision and general questions that we removed it from the build and made it be a client direct package. Again, marvellous, but at least I’ve now got just me to please with no deadlines apart from those I set myself. The next deadline is Christmas, three months since moving in, and even that looks dicey.

We wanted a grand statement, more like a piece of art than just a hole-in-the-wall modern fire. Clinton has always liked CorTen steel, so Steve from Bradley Stoves ,who is doing the installation, recommended a guy called Toby to fabricate the steel cladding. Toby is doing another steel cladding job for Steve, and he runs Arc Fab Sussex in Lewes. Toby’s specialties lie in Big Things like narrow boats, railings, and bridges. He is also a trained artist so likes doing “little” jobs like ours. This “small” piece of steel will be 3 mm thick, 2.6 m high and 2.1 wide with cuts, curves, and supports to house the stove and the TV. Anyway, it was a pleasure meeting him and seeing the site, and now we’ve welcomed Clive the draughtsman on board to measure up so we can have it made.

Screen Shot 2017-10-26 at 11.04.48.png
the goal
house2017.11.04 - 14.jpg
part of Toby’s narrow boat project at the yard

But I’m getting ahead of myself. The stove has sat forlorn, half-installed by Steve’s gang for months while I got my act together coordinating the cladding. The family and I did some final measurements to make sure we were set on the dimensions before Steve’s crowd came up to build out the final interior of the chimney breast.

house2017.11.04 - 46.jpg
think twice, cut once
house2017.11.04 - 21.jpg
first bit of the metal carcass
house2017.11.04 - 24.jpg
more carcass
house2017.11.04 - 42.jpg
the carcass is filled with rock wool
IMG_8104.jpg
the whole thing is covered in 50 mm fireproof board

As well as building the skeleton for the chimney breast and cladding it in fibreboar, the guys also brought up the lovely piece of 30 mm thick Autumn Brown granite that we chose in the summer, now cut to size and all ready to fit. And because it’s St Anne’s and nothing ever goes quite to plan, they gingerly lifted it out of the van, and it broke into two pieces in their hands. Back in the van it went. Of course, the yard they got it from doesn’t have another piece big enough, so I spent a couple of harried days racing round Surrey finding a replacement match. Luckily, I found one in Hazelemere, and I’m waiting on confirmation of the final dims before committing to a size in the order.

Next up is drafting the final dimensions for the steel, fabricating it, weathering it, and installing. Clive is the draughtsman and does the drawings for Toby, so he drove up early one morning to Measure. This is no small undertaking as he takes on board all the risk if the beast arrives onsite and doesn’t fit (actually, if this happens we’ll probably end up rebuilding the innards). He’s a lovely chap who used to be a blacksmith in nearby Bookham. He’s got more involved in the drawing side of things recently but he still keeps his hand in the Making Process by silversmithing. Not so great for his wife who doesn’t wear jewellery he says, but fabulous for his daughter. Anyway, lasers at the ready, and he’s gone away to draw plans and liaise with Toby. If Steve can give us an install date by the time it’s built, the whole thing should be done by Christmas with any luck!

house2017.11.10 - 1 (2).jpg
can you find Clive’s laser line?

Other things brewing are fitting out the study with its desk and cupboards. We’ve got Barry onboard, and he’s been very patient with us while we work out the finances. We’ve got a simple idea, and it’s just a matter of pressing the go button.

house2017.11.04 - 16.jpg
Barry’s plan for the study ..
IMG_8152.JPG
.. is an improvement on this!

Nisi installed the CCTV cameras a couple of weeks ago. After the wire-debacle, we’ve got some natty little grey cameras in three places all linked up to a DVR in the data cabinet.

IMG_8144
eye spy

They’re IR too, so we can track foxes scuttling around at night as well as any miscreants lurking in the shadows.

house2017.11.04 - 20.jpg
I’m watching you, Wazowski

house2017.11.04 - 44The garden has totally taken over in the three years we’ve been out. All those lovely plants I tended for all those years, and all that awful lawn that turned to moss and we cursed over, are all no more. I have only ever once hired a professional to help out with any garden, during one spring when I was vastly pregnant with one kid or other and couldn’t get near the ground much less have any stamina to actually do anything horticulturally useful. But Nicola’s plan required the A-Team of landscape gardeners, so we’ve invited Mark and his gang on board to do the job. A few months back I put out a request for recommendations on Facebook, and almost everyone I know wholeheartedly recommended Mark. So we’re lucky to have him on board with Max, Duncan, Sam, and sometimes Wes & others, and they’re really cracking right on.

house2017.11.04 - 22.jpg
clearing the front of the house including the cherry we planted in 2001
house2017.11.04 - 23.jpg
pile of stuff and protecting the drive

After clearing the site, they brought in 60 tonnes of soil in stages. Robbie the driver got to know the lane really well.

house2017.11.04 - 4.jpg
Duncan laying the soil
house2017.11.04 - 9.jpg
ready for planting
house2017.11.04 - 8.jpg
we’re going to have to watch the street-side for people doing some creative driving
house2017.11.04 - 10.jpg
cleared and ready for setting out

It’s not quite accurate to call the front a “knot garden” as it’s more like a few squares with some defined borders. We’re using steel edges to delineate the beds from the path, and the path will be laid in National Trust-esque Breedon Stone. This is a self-binding aggregate that’s more like a path and less like pea single.

Screen Shot 2017-11-10 at 11.35.21.png
the plan for the not-knot front garden

house2017.11.04 - 36.jpg

house2017.11.04 - 37.jpg
the beds line up with the windows

We originally wanted a standard plant like a bay or a holly in each box, all lit up with fancy spots. But since Nicola has drawn this up, I’ve discovered Anthony Paul Landscapes on Max’s recommendation, and he does some lovely things including a hydrangea set in clipped box. So we’ve decided to blatantly copy that instead. Fewer lights = less cash required = fabulous.

house2017.11.04 - 38.jpg
those rainwater sumps are still too high

One of the reasons we did the whole build in the first place was to re-site the garage in to a more normal part of the house, i.e. the front, and have the sunniest spot as a patio, i.e. the back. It is so lovely to finally see it come to fruition as a space where we can hang out rather than use as a parking space to bake a car or two in the summer sun.

Type 1 scalpings were next, and lovely new soil to the beds. The manhole covers were changed to ones that will have Breedon in them so they’ll disappear more.

house2017.11.10 - 1.jpg
taking shape
house2017.11.10 - 2.jpg
lighting cables under the Type 1
house2017.11.10 - 3.jpg
incoming Breendon on the truck

 

 

Screen Shot 2017-11-10 at 11.44.17.png
the plan for the back garden
house2017.11.04 - 6.jpg
the geotextile membrane goes down first
house2017.11.04 - 35.jpg
the side garden is broken up for fun planting

Max laid the paving so quick that I missed taking photos of it. The yellow Tracpipe is the gas for the fire-pit. Now that we know how long to cut it, we’ve got to get the plumbers back to do the gas work. I’ll try to book them in at the same time to cut the pipe install the whole fire pit thing all at once–saves two call-out charges.

house2017.11.10 - 6.jpg

house2017.11.10 - 7.jpg
wooden edging in the back, rather than steel to save some cash
house2017.11.10 - 8.jpg
one day this will be a fence
house2017.11.10 - 9.jpg
building the step
house2017.11.10 - 10.jpg
the side border along the drawing room windows
IMG_8145.JPG
a lawn!
house2017.11.10 - 1 (1).jpg
so lucky with the weather today–shorts in NOVEMBER

Pointing and bed prep will finish next week, then we can concentrate on planting. I’m due to go with Mark to choose a paperbark maple as a feature tree, and Nicola had Himalayan birch, coral bark maples and fruit trees in the mix too. There’s also a big hedge to plant. There will be a lot going on in the coming months, and this will happen in dribs and drabs when Mark’s got some time. We’re in no rush, especially since we’re not allowed to walk on the new turf until the Spring!

Week 67

Wet on the outside; drying out on the inside.

We tested the fireplace this week with the goal to check the temperature of the surrounding built-out sections of fireproof calcium silicate board. The design we’ve got in mind is to stick a whopping great big TV above the fireplace, but also to ensure it and the electronics serving it don’t melt into goo with the heat. To make it even more complicated, we would like to clad the whole thing in corten steel. Today’s exercise was to sense-check the idea and take some temperature readings with the fire lit.

2017.07.22 - 7.jpg
fire test

The Rais 900 woodburner is a beast of a thing and extremely well-engineered. Despite having read the instructions and having two of my intrepid expert Scouts along who are excellent at firelighting, it still didn’t quite go as planned. We got the thing lit, but there was no draw up the chimney, so all we achieved is to fill the room with smoke which wasn’t in the game plan. Luckily, there are half a billion fans onsite, so after quickly throwing the smouldering pieces out the window, we borrowed one for half an hour to get some breeze in there and air the room out. I must have been doing something pretty silly with the fire because the stove has been tested and has a HETAS certificate, but rather than do my usual and start fiddling around with it and risk a likely trip to the burns unit, I’ve organised a meeting with the installers who will visit next week and patiently tell me where I’ve gone wrong.

Generally, the weather, or at least the temperature, has been on our side for drying and it looks like the contractor will be able to start remedial work a week ahead of schedule. The environmental guys came in early in the week to take the tenting away and to move the fans around.

2017.07.22 - 4.jpg
watching walls dry

One of the bits of kit the environmental guys use is a floor-mounted humidity sensor.It records the moisture in the concrete floor, and this is key information to have before we re-lay all the wood on top of it. It looks kind of like a mini Tardis just sitting there, but unlike the other little red-box sensors from last week, this one can’t be accessed remotely. It’s pretty simple but effective: they seal all around the base and simply leave it to record data. This one is in the master dressing area where most of the water damage occurred.

2017.07.22 - 5.jpg
black box measuring damp in the floor

The walls and ceilings are all discoloured, but it’s dry. Most of the damage can be simply decorated over by using Stain Block and more paint. But sections of ceiling right under the leak will need to be replaced entirely.

2017.07.22 - 6.jpg
one for the scrap heap

After more than two years of letting nature take over, it was time to give the front garden a serious trim. The beech hedge that we planted in 2001 has almost completely reverted to individual trees, and the rhododendrons in the ditch are now providing homes to wildlife. We cut a LOT back, and it’s a good time of year to get some air in there and let in some light on the hedge so it has time to fill out a little before the winter. I’m probably a bit disproportionately proud of my work here only because it was good, honest and hard–the kind of task that you feel in your back a few days afterwards. And it was a bonus that I also got son #2 out of the house and into the sunlight for a couple of days.

2017.07.22 - 1.jpg
not bad for a couple of rookies with shears
2017.07.22 - 3.jpg
at least someone is living here
2017.07.23 - 3.jpg
no more brambles but found bits of our old cherry tree

Many tiny jobs remain outstanding, mainly choosing fittings like door handles and storage units. Did you know that a letterbox is VAT exempt on a new build? As are toilet roll holders. But wardrobes and carpet aren’t? Odd. Also, in all the paperwork for the house move, I changed our TV licence (god bless the BBC) and noticed that one of the details alongside my address and phone number included whether the TV was colour or black and white. I feel that it’s been a while since these laws have had a serious look-see and need a bit of a revamp.

2017.07.23 - 2.jpg
where to put the letterbox in the future porch?

Week 62

Welcome to Week 62 in our 36 Week project…. It’s all about finishing now.

house 2017.06.16 - 17.jpg
bathroom niches have their lights
house 2017.06.16 - 20.jpg
tiled flooring is down in the bathrooms, but no shower screens yet
house 2017.06.16 - 16.jpg
fiddly short tiles cut to finish the floor, but no mirror
house 2017.06.16 - 15.jpg
master vanity unit has been moved, but no lights
house 2017.06.16 - 23.jpg
Rich tiled the utility splashback ..
house 2017.06.16 - 22.jpg
.. and started the tiling in the kitchen

house 2017.06.16 - 25.jpg

house 2017.06.16 - 6.jpg
looks much more kitchen-like; requests for moral support go unheeded…

Lots of pressure to Buy Things like… doorbells. Have you ever given much thought to them? The button bit can be a nice design piece, and there are many many different types to choose from. But the ringer, chime, sounder, whatever you call it, has three flavours: school bell, electric programmable with a bijillion different “songs”, or an antique from eBay. We went for a chrome schoolbell in the end. Boring, but necessary.

house 2017.06.16 - 7.jpg
doorbell: brick mounted or doorframe mounted?
house 2017.06.16 - 8.jpg
garden getting cleared gradually
house 2017.06.16 - 1.jpg
tiling and water butt
house 2017.06.16 - 4.jpg
thinking herb garden thoughts
house 2017.06.16 - 5.jpg
more herbs: got a recommendation or favourite to share in comments below?
house 2017.06.16 - 2.jpg
horrible scary crack filled
house 2017.06.16 - 3.jpg
security lights installed
house 2017.06.16 - 18.jpg
oak beam in lieu of bricks to support garage installed

There was an area on the back porch where the supports under the structural oak were slightly shy of the windows leaving a 20 mm gap. There was 10 mm tolerance generally for windows abutting to structure in the specification, and the guys managed to put it all on one side, making the 20 mm of air. The windows were installed just after Christmas, and this gap had been glaring at us ever since. One transgression for the Quirky House Police, but it’s filled now and looks much better.

house 2017.06.16 - 26.jpg
Paul filled the gap with surgical precision
house 2017.06.16 - 27.jpg
plinth splits for guttering downpipes restored

The bricklayers elevate their work to an artform. I hope that they’ve enjoyed working on this place, because they’ve had a lot to think about. Mind you, this week’s daily quizzes were mostly about war films which really tested my memory of dates, battles and geography. Oh yeah, ….. and what is the only airport in the States with an actual airplane in it? And whom is it named after? But check out the symmetry around every wall and detail as you look at any photo with bricks in. Genius.

house 2017.06.16 - 9.jpg
study is finished with flooring and electrics
house 2017.06.16 - 12.jpg
massive patch panel in the utility room to centralise all the data points
house 2017.06.16 - 13.jpg
fireplace with temporary buildout, but the room looks miles better with a coat of paint
house 2017.06.16 - 19.jpg
colours look alright in the kitchen into family room — Dulux Trade is A-OK
house 2017.06.16 - 14.jpg
master bedroom detail
house 2017.06.16 - 24.jpg
wardrobe rails in
house 2017.06.16 - 11.jpg
electrics are getting there one socket at a time, but not sure about the labelling…

We’re moving in on the Thursday of week 63. In theory. Kitchen commissioning on Monday morning, air permeability test in the afternoon. Tuesday is the contractor’s last formal day on the interior. Wednesday is cleaning, and Thursday we’re in.

When we first started this project I had visions of the finished product being presented in a more defined way. I kinda expected a ta-da! moment. I thought we’d have some time to think about the job, to go around with the contractor in a logical way to see if anything was overlooked, to snag it, to rectify the snags, and to move in with a huge smile. As it is, it’s rushed, the project manager is on holiday, the electricians are still (incredibly shockingly and disappointingly) not finished, snagging hasn’t started, the air-test is going on unsupervised and might fail our SAP calcs for us, and there is still a ton of work to do outside both within and outside the contract. Like, there is no drive and no lawn, but these will be done by others. There are no curtains, yet. And, strangely, there is no TV aerial which somehow counts as AV equipment which was conveniently client-specified but not highlighted until now.

There have been many parts of this project when we’ve seen our naive decisions come to fruition, and some have worked out just fab and the product is marvellous. But mostly, I really just haven’t wanted to look at bits and pieces in case we’d made a poor stab at something. I feel far more fear than excitement or pleasure at moving in just now. Maybe it’s just the fact we’re coming to the end of a period of exam hell with the kids and staffing challenges with the business all at once conveniently coordinated with the week we’re moving in. Maybe it’s because it’s the hottest week of the year. Maybe it’s that the budget is starting to burst at the seams. Maybe in five years’ time this feeling of unease and self-doubt will have morphed imperceptibly into something more comfortable, settled and positive. I hope my future self laughs heartily on reading today’s momentary dip in my attempt to retain a consistently high level of relentless positivity throughout this long journey. This future self will be enormously grateful and very happy in our family home that we’ve had built the way we wanted and was intended to provide the centre of gravity for the six of us at least for many many years to come.

Right?

Week 61

Clinton celebrated a penultimately significant birthday on the weekend by going back to school: blacksmithing school. He’s always happiest when he’s making and building and doing. So with some stout shoes and safety glasses, off he went to the Quinnells’ at Fire and Iron to get stuck in to Make Stuff.  The course was about blacksmithing technique but with an artist kind of vibe; the goal was to take home a few cool pieces at the end of the two days. With a little guidance from the instructors, he’s gone and made something quite amazing, unique and special. You’ll have to wait for the great unveiling in a future post, but I will hint that it’s for the house.

house 10.06.2017 - 6.jpg
Iron Man

The long-awaited visit from British Telecom to attach the house to the rest of the planet was scheduled for Monday. Matt the Engineer arrived promptly first thing to rig up the line. Jamie got stuck in to finish off the trench, and James and I deciphered where the electricians had cunningly hidden the location for the BT box (spoiler: in the garage). So Matt got busy connecting, and Jamie filled in the trench afterwards. Apparently there’s a dial tone and everything!

house 10.06.2017 - 1.jpg
we love a good trench

Other outdoor work included laying more paving slabs and turning on the outdoor lights.

house 10.06.2017 - 15.jpg

house 10.06.2017 - 16.jpg
replacing a wobbly slab

Steve’s team came to install the wood burner in the middle of the week. Cue much amusement from the guys wanting to know when the fish will be delivered. Installation went off mostly without a hitch with a little drilling out of the brickwork for ducting and a little bricking up for a base that the thing sits upon. It’s a closed system, so we don’t need air bricks to the room, but there is a need to supply air to the appliance itself, and another need to vent out the chamber so it doesn’t overheat, especially since we’re sticking a great big TV above it (eventually). The extra size of the exterior brickwork plinth at the bottom made it a little challenging for the guys to connect the bottom duct since it was so long, so they had to come back the day after and finish the job. It looks great as it is but we’ll add to it in time: eventually the build-out sections will be built bigger so the TV is set back behind the stove. We’re going to develop this design with Steve now that this portion of the job is complete, but at least it’s safe at the moment and passes all its HETAS requirements for building control. It’s a complicated design, but Dave’s watching over it, and it will be awesome.

house 10.06.2017 - 2.jpg
Rais 900 all alone
house 10.06.2017 - 3.jpg
where it will live
house 10.06.2017 - 23.jpg
woodburner, mid-install
house 10.06.2017 - 7.jpg
temporary buildout and ready to go

The mechanical ventilation system failed it’s commission a couple of weeks ago, which was slightly scary. The pipes are all running in the void between the concrete first floor and the ground floor ceiling, and getting to them now would destroy a ton of decorating. The system runs to all the wet areas including the downstairs coats cupboard where all the electrical controls are housed. The problem was that there wasn’t enough suction on the longer runs to the other side of the house and to the kitchen, so it failed its installation tests. We have been waiting on tenterhooks seeing how the company would deal with this, and they came back this week to fix it. Their solution was to fit a second motor in the loft to give it enough oomph. So now we’ve got double-spiders up there, all labelled up nice and pretty, and it sucks like fury. Hooray!

house 10.06.2017 - 4.jpg
fancy MEV

You may have noticed in one of the photos above that the exterior light was ON! Yes, the lights are on at long last. Lewis was characteristically sanguine about showing me the gleaming little LEDs and lovely warm Edisons outside, but I am pretty sure he’s kinda proud of getting near the end, and I think I even caught a sly smile or two in there somewhere. It’s another threshold of making the house look like a home.

I’ll take you on a tour of some of the mostly-finished rooms….

house 10.06.2017 - 8.jpg
shoes-off policy upstairs now that the floor protection is up
house 10.06.2017 - 9.jpg
Gareth’s room
house 10.06.2017 - 10.jpg
Gregory’s room
house 10.06.2017 - 12.jpg
first floor hallway
house 10.06.2017 - 13.jpg
the glorious linen cupboard!
house 10.06.2017 - 14.jpg
Gillian’s room
house 10.06.2017 - 17.jpg
up close and personal with a newel post
house 10.06.2017 - 18.jpg
boys’ bathroom with burglar PIR in hallway
house 10.06.2017 - 11.jpg
master vanity needs shifting to the right 100 mm

It was all looking marvellous indeed! But then… the heavens opened. This time last year, you’ll remember that the storm drains on the local roads up the hill failed, and my neighbours got flooded out with the grounds guys altruistically running bricks to them to raise their furniture before the water got to their beds and sofas. Since then, much repair work has been done, and one neighbour was able to move back in just after Christmas; the other is due to move back in at the end of the summer.

This year it was our turn for drama.

The water was either down to the oak frame or the windows, and it was only in a few places. First we phoned Neil who has built a bijillion of oak frames in his career, and he was totally cool about it. Although he’s never seen anything like it, he offered some suggestions and kept a cool head. He was down onsite two days after we called, and he agreed to do some sealing around the edges as a failsafe. He came with Grant and an enormous ladder on the weekend to put the CT1 in some gaps and seal it up, so we won’t be seeing this sort of thing again. The next step is to talk to the window company about the seals around the windows, but that’s a little more complicated because there are so many materials (mastick, sealant, bronze frames) to contend with. Ben’s on it and we should come up with a solution to cover that side as well soon. This belt-and-braces approach should mean we’ve got an air and water tight arrangement, and this is important as we look forward to the all-important Air Test for the SAP calcs in a couple of weeks.

The brick guys returned to repair the damage we did to taking out the piers, and to fill the extra holes the in the bricks made by the electricians in their quest to find good spots for outdoor lights and power. They should finish up next week so they’re only here for a wee bit, but I didn’t get away lightly…. “Who was the last man to walk on the moon?”, asked Paul in the morning. With a completely blank mind, I said Charlie Duke whom I knew was an astronaut, but I also knew was the wrong answer. I’ve even read Andrew Smith’s Moon Dust, and I SHOULD know these things! When I came back onsite in the afternoon to drop off some thing or other, it was “What’s so significant about the River Roe in the States?” Galling, because I’m American, and I’m sure he picks these questions because of it. I will leave you to go and find the answers yourselves!

house 10.06.2017 - 5.jpg
chipping out the decimated brickwork
house 10.06.2017 - 1 (1).jpg
redoing their own work

And James has got all comfortable in his man-cave in the kitchen.

house 10.06.2017 - 1 (2).jpg

 

Week 58

Without going into too much drama about tempers flaring, lines of communication being tested, inspections on the edge and deadlines looming, …, despite all this, it’s all mostly going to plan. This week’s post will be mostly pictorial as I’m struggling to write anything at all coherent in the rush to finish this project. Loose ends include all electricals as we haven’t seen a blub a-flickerin’ yet, the entire fireplace concept, some of the big wood pieces from Neil, the sanitaryware, tiling and the drive. On the positive side, the Moldovian chippies Adrian and Vadim are generally fantastic and are busy getting on with doorframe, skirting and ironmongery. Terry and Josh finished the stairs too–I don’t think they’ll be in a hurry to fit any more capping in the hand and floor rails, but Josh remains undeterred, even when faced with a chisel in his hand and a trip to Epsom hospital. Didn’t stop him smiling when he returned to site to finish the day’s work.

The cornice company arrived early in the week and transformed some of the rooms.

house2017.05.23 - 9.jpg
awesome coving, but, oops, poor decision on light placement
house2017.05.23 - 10.jpg
does this work around the units?
house2017.05.23 - 1 (1).jpg
drawing room looking more formal

Finishing touches around the staircase are being decided with things like skirting beading, window/stair boards, and capping under the newels. James is great at making use of extra pieces to create some of the finishing touches. And it’s only when you see these things installed that you can get a feel for what the finished product looks like. Most things have been fantastic, and some require small tweaks, like the window board used on to top the plasterwork in the front bay. We’ve decided that the trim should have a profile more like the stairs, so this bit of boarding will be replaced, but it was excellent to have the flexibility and chance to check out the profile and have the option. This exercise prompted some deep thinking about what exactly we’re trying to do in the space.

house2017.05.23 - 1.jpg
is it a window board or a stair board?

Likewise with the trim between the structural oak and the floorboards. Initially, I wasn’t keen to have so many different kinds of oak hanging around, so I didn’t want the trim in at all when we started the finishes. And James’ advice was not to have too many different trims or the whole thing looks cluttered. But now I feel that if each piece does what it’s expected, then it follows the ethos of honest materials in the house, and it should be ok to have a little bit of trim that matches around the house, and it will blend in better in time. We opted for the little bead around the structural oak in the photo. The floors remain protected, and the windows will have a layer of dust on until the final sparkle-clean, so it’s hard to tell what the final finish will be anyway!

house2017.05.23 - 2.jpg
beading on the floor
house2017.05.23 - 5.jpg
under-newel

Vadim and Adrian have been boxing in pipework and building wardrobes around them. We’ve decided on a semi-complicated painting scheme with the interiors being darker shades of each room’s trim.

house2017.05.23 - 14.jpg
Gemma’s wardrobe
house2017.05.23 - 15.jpg
Gillian’s wardrobe
house2017.05.23 - 7.jpg
double checking the spec on ironmongery

Looking forward to snagging the kitchen next week. We’ll discuss a few trimming bits, and do a double check on things like the work-surface edge.

house2017.05.23 - 8.jpg
discussion piece: is this pencil or bevel?

The bathrooms are looking good, but we’re finding a few things that could have been better designed. Like,…. the door slamming into the unit when entering the bathroom. We’ll have to install a rubber baby buggy bumper on the back side of the door along with advice to tell the boys to be jolly careful without entering their bathroom with too much energy (shouldn’t be a problem, they’re a bit slow int he mornings). Much consultation with Allison in the States and friends in the UK to generate a survey of vanity unit heights in an attempt to get ours right. We’ve decided 900 to top of unit is a good height–a little higher than most, so it won’t be our family keeping the local chiropractors in business.

house2017.05.23 - 16.jpg
boys’ bathroom

In a dull moment, the guys found time to remove the plinth they’d lovingly installed before we changed our minds. Our MO seems to be build it, then remove it….

house2017.05.23 - 6.jpg
plinthless fire

…. just like the piers!

house2017.05.23 - 11.jpg
looks better now

house2017.05.23 - 12.jpg

Clinton never really liked the piers in the front; they were only put there to carry the rainwater downpipes into the ground in a clean swoop. So, taking advice from the architect and structural engineer who both said that they weren’t critical to the structure, we decided to take the bold (= expensive) move to remove them. This leaves an obvious problem for the bricklayers who now need to come back and make these areas pretty again. But the overhang looks much less fussy now, and we’re happy with it. At least we were until a giant gaping crack appeared around the first floor cavity trays.

house2017.05.23 - 18.jpg
omg

On further advice, we adopted a suck-it-and-see approach, and the whole thing looks pretty stable despite the crack. It hasn’t shifted since it first appeared, so should be ok. After all, there is an enormous great big steel holding up this side of the house, and the roof is all complete as one separate structure spread across the whole building. It SHOULD be ok. At least it is when I close my eyes. And a little mortar in the joint before we move in and all will be well. Right?

Lee, Jamie, Djokovich, and the groundwork gang were back to lay the paving for the patio. Their work was hampered by the water board inspector who deemed it fit to ask the guys to dig the main supply to the house a little deeper. This was an enormous pain which required un-building of the garage and some of the edging stones the guys had laid last week. The inspector didn’t stop there, took a deeper look at some of the work and started going off on other trench work depths, like the supply into the taps in the garden. He even had a go at some of the pipework internally, which never happens apparently. Usually the inspector has a cursory look around near where the water enters the building and leaves the M&E team to get on with things downstream. The groundwork guys have done hundreds of jobs like this without fuss, and the plumbing team was livid by the time the inspector finally passed it all, and all the trenchwork could be filled in. They’d none of them ever seen anything like it. Clearly this house has been jinxed from the start. The guy earned a few choice nicknames around site, and luckily for him some of the spare pieces of wood lying around didn’t get airborne.

house2017.05.23 - 1 (2).jpg

house2017.05.23 - 13.jpg
high water table in the mains trench
house2017.05.23 - 4.jpg
on the positive side, slabs are looking good

We’re even venturing into town to look at furniture and light fittings. Mostly these experiences highlight that fact that neither of us like shopping very much, nor do we like going into town unless it’s work related. We’re much more country-bumpkins these days. Either we’re super boring (likely), or we just dread the time it takes to travel around aimlessly looking at one low-profile uncomfortable sofa after another. I think Clinton was definitely going to lose the plot entirely if he got close to one more Edison bulb singeing his retinas.  The best way forward is to continue on our current course of clicking our way through doing most of the furnishings.

house2017.05.23 - 3.jpg
keeping the guys happy

Week 51

Ben had the drone out and it’s great to finally see the roof in its glory. Here’s a visual progress report from the get go.

And these….

DJI00165 - Copy.JPG

DCIM100MEDIA

Tony had the fire on early in the week, so he kindly invited Ben and me to have a look at making balusters. Each of these is completely hand made by drawing out the bar to a point, then curling it very carefully to match the test piece precisely. Incredible work and much labour involved. Tony has Dave in to do the hammering and finishing, and anyone with eyes can see that their years of working together on projects like this make it seem so easy, but in fact it’s a lot of unspoken expertise involved to make each baluster. There are a lucky-13 curlicues that are framed by straight ones going either up or down. Should be amazing to see when it’s done.

The joinery company making the stairs have been brilliant in supplying Tony with scale drawings of each piece. Colin has travelled from Andover to Betchworth (more than once!) to deliver the drawings and talk about the work with Tony so that the joined up staircase between the two completely disparate trades are installed seamlessly at the end of April. Can’t wait!

house 2017.04.02-1.jpg
Tony and Dave working to draw the bar into a point

house 2017.04.02-4.jpg
checking the curve by eye
house 2017.04.02-13.jpg
bending vice

house 2017.04.02-15.jpg
forest of balusters
house 2017.04.02 - 13.jpg
a proper working forge
house 2017.04.02 - 14.jpg
sorry, can’t stop taking photos of these

Meanwhile onsite, the wood floor arrived. Usually, they hoist the planks up box by box, but the ceilings are a little high for that here, so they were hoisted up two planks at a time–it took a while.

First the guys prime the floor, then they lay a layer of latex which acts as a barrier between the concrete floor and the wood. They mix this bucket by bucket onsite. Then a really thin membrane of foam is cut to shape, and finally the floor is put on top.

house 2017.04.02a - 1 (1).jpg

house 2017.04.02 - 7.jpg
the wood arrived, hooray!
house 2017.04.02 - 8.jpg
primer coat
house 2017.04.02 - 1.jpg
latex milk
house 2017.04.02 - 11.jpg
mixing gear
house 2017.04.02 - 2.jpg
pouring latex on a primed section of floor
house 2017.04.02 - 3.jpg
spreading around by hand
house 2017.04.02 - 6.jpg
Gillian’s room with the finished floor

The services are being installed gradually. We’re waiting on the water board to come and inspect its trench, so although James doesn’t like leaving it open for health-and-safety, it has to be left until they drop round. The boiler should arrive soon; the flooring guys need it so some heat can get into the floor to dry it out. So we were very pleased to see the gas company arrive and install the meter in the hedgehog box around the side of the house. After the drama of last week’s engineer unable to install, this took a grand total of 10 minutes and the guy was off. And the three-phase upgrade for the electrics will be in the middle of April.

house 2017.04.02 - 4.jpg
not a hedgehog
house 2017.04.02 - 17.jpg
ready for electrics

The Sparks are in cutting holes in the ceiling. There is so much to this electricity piece, and we haven’t even chosen any fancy fittings yet. Here’s a challenge for you: next time you’re in a place with small LED ceiling lights, go ahead and have a look at the geometry of their placement. The glossy mags always say to hire a light designer because you yourself as a layperson could never hope to achieve a good effect: what you’re lighting, how you’re lighting, when you’re lighting, controls….. The Sparks want things in grids, as do the architects. We’ve opted for a DIY approach to tweaking Dave’s placements just a little in order to centralise some of the fittings around architectural features like doorways and cupboards. I’m no expert at this, and I hope that I will remember fondly this m.o. when I’m not too upset at the finished product but instead, basking in the glow of the thousands of pounds saved that I didn’t pay to the lighting designer. (Fingers crossed, obvs.)

The guys use their laser sights and chalk lines to get the rows straight. This doesn’t please the decorators who then have to wash off the chalk because the dye runs into the paint, especially if the paint is white. Like on a ceiling. Where the lights are. Duh.

house 2017.04.02 - 18.jpg
takes a day to set out
house 2017.04.02 - 5.jpg
and another couple to drill

The non-herringbone panels on the side of the house are coming together. I had a total 4 am brain-fade about the side panels which are not at 90 degrees, but rather are offset and parallel to each other. I texted James about it suspecting they’d have to rip off the half-laid panel, but he replied with a photo of the plans which clearly show the bricks in parallel. Glad someone’s on the case! And note to self: consult the plans before hitting the panic button.

house 2017.04.02 - 19.jpg
brick slips

But there are still a bunch of gaps in the design. The biggest one is the fireplace, and Steve came up from deepest Sussex again to speak with Dave and me about how to accomplish what we’re after for the surround. We’ve made it enormously complicated, and probably unfeasible from an engineering point of view. We’d like a floating stone mantle–but how to fix it? Lots of head scratching, and to be honest I’m about to give in to a simpler design. This room was never designed to live in, mostly to look at, and this is disappointing as we should have thought about it more from the start. The windows are too close to the fireplace wall to put units in, and the building regulations put so many restrictions on measuring out non-combustible zones that it’s all very tiresome. We’re at that last 20% that takes 80% of the effort. But it will be beautiful, the workmanship is great, and it’s only complicated because we the clients are trying to squeeze too much in. Much better to simplify, pare back and let the features in the room breathe a bit. Watch this space.

house 2017.04.02 - 9.jpg
blank wall, blank heads

Another bug-bear is the garage roof. The guys have done a brilliant job at getting the end to just kiss the fence, so the dimensions are perfect. But how to support it is another kettle of fish. The original (built, then unbuilt) brick pier was a thing of beauty, but it didn’t give us very much room to get around. So we’ve opted for an oak post on a smaller plinth instead. In the meantime, there is a slightly bendy Accro holding the roof up at the spot where Terry says holds the max load. But this still leaves us a little short on space to get around. Do we place the final post off the sweet spot either towards the building or away from it and add a stiffening bracket? Can we? Or do we suck it up and just stick a post in?

house 2017.04.02 - 10.jpg
jury is out on replacement to bendy Accro

Last week’s tile-hanging design query was bottomed out, but this ended up being just a case of making sure everyone was looking at the same revision. The flare at the bottom will be great, and the roofers will fit in the tile hanging when they next have a gap in their diary. It’s a stand alone piece, and not mission critical–which is refreshing!

house 2017.04.02 - 16.jpg
flare supports

 

Week 50

Spring is springing on the way to site.

_house 2017.03.26-1.jpg

_house 2017.03.26-19.jpg

While the weather improves and we’re thinking about trenches, services and meters, here are some pix of the outside of the house.

house 2017.03.26 - 1.jpg
roofers roofing
house 2017.03.26 - 4.jpg
ground guys digging
house 2017.03.26 - 3.jpg
back doors shining
house 2017.03.26 - 2.jpg
ready for downpipes
_house 2017.03.26-3.jpg
more roofers roofing… on a Saturday!

The problem with glazing bar alignment across the two planes of windows in the front bay that we had back in Week 42 has been resolved. Thank you to the Bronze company that agreed that this couldn’t be left as it was. It’s funny: now that the bars align, you kind of don’t see them any more. Good design kind of disappears.

_house 2017.03.26-8.jpg

Doors are on.

_house 2017.03.26-4.jpg
welcome
house 2017.03.26 - 8.jpg
…and the side door we’ll probably use more

This isn’t a standard box house, it’s very complicated. It’s also been through three sets of architects, two contractors, and lots of TLC and tweaks along the way. Like Terry designing the kick to the garage roof off the cuff with no plans. Some of the details only make themselves known when things are being fitted, so it’s helpful (not sure Tim and James think so..?) to be able to take time out and be onsite more and more as we race towards the finish line.

Case in point is the downpipes. There is one in the front labelled clearly on the drawing, and it goes right up in the corner between the vertical tiles and the huge two-storey beam. Well, having a drainpipe alongside the oak is a dippy idea as it’s front and centre and visible to god and everybody. But it wan’t not obvious until it was right there. A puzzle and much discussion: we can’t ditch the pipe because a LOT of rain will be flowing down that little section of gully. Water from the valley section and three faces of roof will be chucked down here right next to wood. But it dangling there alongside the wood and block its view was equally lacking. The solution that Spencer suggested as to add a few strategically placed special plastic vertical tiles that you can fix downpipes to on the opposite side of the gutter section, about three feet out from the gable and down the pillar to the east. That way you get your flow, and it’s away from the wood. A super plan on the first floor, but still not great on ground floor, because each downpipe is cut into the plinth at the bottom which is a gorgeous detail, and there isn’t one built in the new spot. I’m sure James will work something out……

_house 2017.03.26-2.jpg
looking up the beams and thinking about locating that downpipe

Architrave and mist coats are making the ground floor look more finished every day.

_house 2017.03.26-5.jpg
kitchen and family room
_house 2017.03.26-16.jpg
kitchen proper: the working area
_house 2017.03.26-6.jpg
drawing room
_house 2017.03.26-9.jpg
hallway looking north
_house 2017.03.26-10.jpg
hallway looking south
_house 2017.03.26-11.jpg
hallway looking up
_house 2017.03.26-14.jpg
quirky hallway upstairs
_house 2017.03.26-17.jpg
choosing colours again

house 2017.03.26 - 9.jpg

house 2017.03.26 - 10.jpg
khaki mist 3 or patters clay 2?

And ironmongery….? Luckily we’ve found the mecca of hinges and handles, and it’s in Fleet. We have dithered for weeks about finding a match for the bronze windows, much to the annoyance of Tim who simply wants to get the doors ON ferchrissake, but nothing was doing the job. Actually, there is a company in the States that does the job if you want to spend about £1k per doorset. Have not yet won the lottery so clearly not an option. So we’re going for black to match the balusters and to be a little non-controversial. Graham is helping us, and he’s immensely patient with our wavering and our questions.

house 2017.03.26 - 7.jpg
more choice than most

With all the flooring being laid shortly, James helped us in choosing the exact locations for the ground lights in the hallway and master bedroom. These are meant to light up the oak in a subtle way, but as we’ve not chosen the fittings yet, James left a suitable gap where they’ll go and concreted in around them. He didn’t waste any time: we were there with sections of pipework in the afternoon, and before they’d packed up, the lights were were packed out.

house 2017.03.26 - 6.jpg
light spot

With deadlines about colours, hinges, ironmongery, garden slabs, light fittings, driveway colours, and fireplace design passing us by, tempers are getting short. We are all working towards the same goal, even though it’s challenging to stay positive and keep all our pointy fingers from taking aim. When things like the long-awaited gas meter are put back as the installer drives away because the job was labelled for the gas board’s subcontractor as a Swap instead of an Installation (it WAS a swap, just a swap for a missing meter, remember?), it gets a little frustrating.

But then you’ll get one of those awesome spring days where everything is fresh and blue, and we’re reminded that everyone on this job is on message about quality, the finished result is gorgeous, and it doesn’t seem so bad.  Good weather and more cake… that’ll fix it.

house 2017.03.26 - 5.jpg
lovely

Week 48

Goodbye scaffolding! It took three days to get all the gear down, and now we can see the whole building.

house 2017.03.11 - 11.jpg
scaffold neatly stacked and ready to depart

No scaffolding in the way means that Terry and Josh can get on with building the roof for the garage. This is a wiggly little beast that has had Terry brushing off his thinking cap to calculate the pitch of the flare. The flare determines the soffit width, and the soffit width determines the supporting post position, and all this is constrained by the location of the neighbour’s fence. And don’t forget the guttering…. Much hemming and hawing occurring this week, and even Dave was onsite to have a look and a ponder. In the end, we all reckoned the best way to build it was just to get on with it and see how it fell. So we all left Terry and Josh to it, and by the end of the week, they had a plan that matched the flare the same pitch as the rest of the house and he reckons the guttering will just kiss the border just like the old house used to.

house 2017.03.11 - 10.jpg
the first truss on the garage
house 2017.03.11 - 5.jpg
building the garage
house 2017.03.11 - 14.jpg
more trusses from the back of the house
house 2017.03.11 - 25.jpg
and even more from the front

Lee, Sean and the groundworks team have been back with their digger to make the rainwater drains meet up to the soak-away in the garden. There are six downpipes at the back of the house that all run to the inspection port. It was a little odd to see the this thing poking its head up above lawn-level, but the plan is to cut it down to as low as it can go, and if we ever need to rod the downpipes we’ll have to find it and dig it out to get access. This is ok with me. I regularly used Douglas’ old set of rods to sort the drains in the old house, so a bit of potential digging on the off-chance that these need sorting isn’t going kill anyone.

house 2017.03.11 - 12.jpg
inspection port
house 2017.03.11 - 24.jpg
groundworks return
house 2017.03.11 - 1.jpg
nimble digger
house 2017.03.11 - 6.jpg
garden massacre but the camellia is undeterred

Now that we’ve sorted the design on the fireplace and have signed off on the plans, it’s down to the guys to build it. But there are still a number of trades to coordinate: stone, joinery, fireplace, general building, electrics. There is a lot to this piece. I had my first foray into sourcing stone this week having gone to the stone yard to have a look at some off-cuts. I hope the inside does justice to the outside.

house 2017.03.11 - 2.jpg
lots of stone
house 2017.03.11 - 8.jpg
chimney symmetry

It’s always a challenge to walk around site and to visualise what it will look like when finished. It’s hard to resist taking photos of general stuff going on, but equally hard to figure out where the best vantage will be for the “before” or “during” snap to compare to the finished “after” one.

house 2017.03.11 - 13.jpg
during?

Nicola’s design is being finalised, but here is a quick working-drawing teaser.

house 2017.03.11 - 4.jpg

The plasterers work hard when they’re onsite–we just need a final push to get it done and then the architrave and skirting can go up. In preparation for that day, Clive is staying out of their way and has got a great system set up in the master bedroom for the task of painting miles and miles of wood.

house 2017.03.11 - 15.jpg
family room ceiling — tick
house 2017.03.11 - 16.jpg
kitchen with plasterers’ platform
house 2017.03.11 - 17.jpg
living room with tray ceiling and bags of plaster
house 2017.03.11 - 18.jpg
ground floor ceiling protrudes until the landing apron is installed
house 2017.03.11 - 19.jpg
Osmo-ed architrave
house 2017.03.11 - 21.jpg
relief grooves in the backs of the tall oak skirting
house 2017.03.11 - 22.jpg
Clive loves his Osmo

We’ve come up against a stumbling block with shower trays. The current ones we’ve chosen are expensive, and two don’t fit. One of the wells made for them to drop into is slightly too small and we’d like to see if we can grow it. This shouldn’t be too much of an issue, until you take into account the underfloor heating. Risking making a hole in the pipes set in concrete to chip out the necessary extra 100 mm would be catastrophic at this point. So we’re trying to figure out other alternatives, one of which might be a wet room type of thing. Tim can’t start tiling until the trays are down so we’ve got to get our skates on to sort this out or the whole programme will suffer and we’ll push everything back weeks. The jury is still out while we research other options, so in the mean time, here is a photo of the shower in the girls’ bathroom.

house 2017.03.11 - 23.jpg
where’s the waste, Wally?

You would think that choosing colours would be the fun but, and it is. But agreeing on colours is another matter. And nudging the kids to make decisions about their rooms is proving a challenge too. Tim says to paint the whole thing white and wait with colour until the rectification period is over and the inevitable cracks are plastered over. This makes a LOT of sense, but it is so tempting to just paint it its final colours and get it done. With our usual speed of making decisions on this project, it may be after the warranty period before we finally decide, so Tim just might get his way after all. And by then, Tim will be sailing off into the sunset, drink in hand, remembering fondly the lovely job he did at St Anne’s and it being ancient history!

house 2017.03.11 - 9.jpg
tableau of indecision
house 2017.03.11 - 3.jpg
Josh needs a new pair of boots

house 2017.03.11 - 7.jpg

Week 47

We have a flue!

house 2017.03.05 - 1.jpg
no jolly men in red suits today

Actually, it’s a flue liner, not to be confused with the identically named but made of pumice ‘flue liner’ that was already installed with the chimney went up. All very technical, but for the past few weeks, Dave has been developing the plans to make this thing work.

Screen Shot 2017-02-28 at 15.57.22.png
These are the best laid ones of the bunch…
house 2017.03.05 - 2.jpg
installing the cowel at the top
house 2017.03.05 - 6.jpg
all set to go

Terry and Josh have made a start on the garage roof. This first requires brackets to be attached to the wall on one side and onto the brickwork on the other. They were making good headway until they got called to build a new skin to a wall in the hallway later in the week.The problem was a very small area of single skin which was going to make the place thermally inefficient and vulnerable. This issue had been brewing for a while as we’d been waiting for approval from the warranty company with this wall design and with a little pushing from Ben, they finally approved the thinnest version which is great because it allows more of the oak frame to be exposed. But it’s a problem no longer, as the thing is now built at long last, and the plasterers can get on and finish it off.

house 2017.03.05 - 1 (1).jpg
Terry’s garage roof brackets
house 2017.03.05 - 17.jpg
thicker wall

Aaron’s been in to finish the first fix wiring. The wires have been capped and cased all over the house, and they’re making maps of were they are under the plaster so we don’t end up sticking nails through them when we put up artwork.

house 2017.03.05 - 3.jpg
breaking a few eggs before the omelette is finished

Once Aaron was done, there was a whole gang of new plasterers that came and put the ceilings up. It’s very high tech with laser sights and grids of brackets to hold up the suspended ceiling that hides the electrics and plumbing under the concrete upstairs floor. They’ll still be about 2.8 m off the deck.

house 2017.03.05 - 4.jpg
straight line gizmo

One last trip around the scaffold to check out the finished roof.

house 2017.03.05 - 5.jpg
can’t resist taking another of these pix
house 2017.03.05 - 11.jpg
cloaking tiles
house 2017.03.05 - 10.jpg
a mortar snake through a hole in the slate (these just flick off)

house 2017.03.05 - 7.jpg

house 2017.03.05 - 8.jpg
lead dormer cheeks
house 2017.03.05 - 9.jpg
pencil lines showing the handmade workmanship

The doors arrived at long last. It took four guys to lift them off the truck, and they came pre-assembled in their frames. James, Terry and Josh will fit them next week which will make the building will be almost air tight. This will not be a small undertaking. As you can see, we have yet to choose a doorknob in the centre. Clinton actually bought a brass casting kit a couple of years ago, and we’ve got some thoughts, but it’s got to be good. No pressure!

house 2017.03.05 - 12.jpg
colossal front door (it’s upsidedown)

The plasterers are just about done upstairs and will move downstairs next week. Like the rest of the house, it’s not been straightforward: there are some fiddly bits like in the upstairs hallway and some enormous swathes like the stairs wall and the whole of our bedroom. They’ve done a great job, but they’ve got to get a wriggle on to finish downstairs before the floor goes down.

house2018.03.05-4.jpg
master ceiling
house2018.03.05-5.jpg
plaster in the master bedroom
house2018.03.05-8.jpg
hallway looking east

 

house 2017.03.05 - 16.jpg
hallway looking west
house2018.03.05-9.jpg
stairs area
house 2017.03.05 - 14.jpg
lunch pail

And then the scaffolding came down….

house2018.03.05-1.jpg

house2018.03.05-2.jpg

house2018.03.05-3.jpg

house2018.03.05-7.jpg

house2018.03.05-6.jpg
a good before picture of the knot garden